Monday, November 14, 2011

Friday and Saturday, November 4 and 5th -- Moving Right Along

Eric Busa and David continued to move forward with the cabinet install.  See the pics below.  The refrigerator cabinet and the cabinets under the kitchen window is in. 

Also, the guys from Ieraci placed the screened loam on the front lawn.  Looks great without the old driveway.  Furthermore, the front steps are done. Looks amazing.   The side walk has been cut to curve with the new driveway.  And, the back yard has been prepped for the patio!  

Thanks Eric for organizing so much for the weekend. 







Below, the cut to flow with the new driveway! The loam looks amazing!



Preparation of the back patio:



 Lots of pavers!  We went with Quarry Blend from Ideal.

The front steps!












No comments:

Post a Comment