Saturday, December 3, 2011

November 28 to December 2, 2011 -- Hardwood Floors Stained and Sealed (1 Coat) and More Tiling

This week, the hardwood floors were sanded and then stained.  It left one bad smell but our family kept our current master bedroom safe from the fumes and we slept there.  The smell left pretty quickly and Eric Busa went with a water-based poly that was POV- (or POC or whatever the use for smell/toxicity) friendly.  The water based dried pretty quickly and we had amazing floors afterwards.  Eric Busa recommended we do the last coat(s) after the final work has been done in the interior.

Master Carpenter, Eric DaSilva and Derrick Hicks continued to work on the tiling (master bathroom and 1/2 bath) and the outside decks.  At the end of this week, the master shower tiling is close to being done and the master bath floor has been finished but for the grout.   The 1/2 bath is complete.

According to Eric Busa, next week will be the final mechanicals (plumber, electrical, etc.) ...  we are really close to being done!   Honestly, it's hard to stop thinking and looking back at this adventure and be amazed of what Eric and the gang have been able to accomplish.  Well, I'll do that when we are finally done.

Eric also had the gas fireplace installed in the family room too!

More steps to the eventual end....

Anyway, here are the pics below.

Kitchen/breakfast area:





View down hallway from current family room into kitchen:


New family room:








View from family room into kitchen:


Master bedroom:





The balcony:  



View from balcony down to family room:



View down hallway into master bedroom:




Back bedroom:




Tile for master bathroom:  Gazzini Summer.


Shower tile being installed:



More pictures of Erik DaSilva working on the shower tile.  Boy did he have an eventful week.  Topic for a while other blog.  





1/2 bath tiling done.  Foyer to go (next week, I hope).


Front decking being installed.  We are going with AZEK composite.  NO MAINTENANCE NECESSARY.  The color is Java or Mocha.  Some dark coffee color.  I think this color does well to emphasize the brown color of the siding.




Back deck being put together.  Same decking as front.

You know we are getting close to the end when THE LADDER that was there from the beginning is now OUTSIDE of the house...  Thanks to Derrick for making it.  We have to find a home for this when the project is complete!




 We're getting close to being able to buy a XMAS tree!




Thanksgiving Week -- Hardwood Floors and More!

Eric Busa had the project going full steam during Thanksgiving week.  We have moved on to the floor work.

The hardwood floors were put down.  Take a look!  It took a couple of days for them to put it down.  The following week will be the staining etc.

Also, take a look at some colors of the rooms.  Al and his team put on almost final coats.  They will be back at the end of the project to do the finishing and appropriate second coats where necessary.

Furthermore, Eric DaSilva and Derrick H did more carpentry and tile work.  See below for the pics.

Carrington Beige (Benjamin Moore) is the color for the family room/foyer:





Color of the 1/2 bath -- Cottage Red.  All colors are Benjamin Moore.  See also the wainscotting.





 Master Bedroom (Templeton Gray):



Master Bath -- November Rain:


Upstairs Bedroom (Carolina Gull):


Al and his team painting the portico and some trim:





The hardwood floors are being installed!








One of the many floor guys.  They put down the floor to the addition in 2 days.  The guy in the pic is a really nice guy.  Eric B works with some good subcontractors:






Eric DaSilva and Derrick Hicks working on the jacuzzi surround:





Also, Eric D started work on the floor tile in the master bathroom!



 Derrick grouted the laundry: